Well, we made some great progress these two weeks. Weather was both beautiful and sunny, with some very cold nights... some very foggy mornings, etc. ONCOR pulled cable through and we now have permanent power. Corinth Water Supply re-routed a water line, put in a meter and trenched our line to the house. Barn continued to go up, ran power conduit to the barn and we poured the house piers. The house beam got dug and should pour this next week.